In the next phases of the MINOS
Programme and based on the results that will be extracted from the
operation of the Pilot Plant, a Feasibility Study will be performed
for the scale-up of the specific technology at full-industrial scale
at a focal level in order to serve geographical areas where a
significant number of olive oil mills is operating. The final results
concerning the performance of the MINOS technology, its potentials for
application at full scale and the viability of such an investment will
be available at the end of the A’ semester of 2004. |